A partnership between Swansea University and the region’s semiconductor industry
Centre for Integrative Semiconductor materials (CISM)

Bringing together semiconductor and advanced materials platforms and processes to deliver new technologies and products. Helping to create the skills and talent to keep our industry at the leading edge.
Providing a range of services from blue-sky research to applied R&TD, prototyping and process development, specialist services, incubation, engagement, training and access to the UK and EU innovation grants portfolio.
Manufacturing meets research and development
CISM – will deliver a bespoke, integrated facility for semiconductor research and technology development on Swansea University’s new Bay Campus containing:
- Manufacturing grade, ISO-qualified clean rooms for process development
- Backend materials integration and packaging capability
- Advanced NNG research laboratories
- II/III-VI MOCVD growth facility
- Customer Bays for SME incubation
- Access to advanced characterisation and analysis [microscopy, surface analysis, chemical, optical, electrical]
- Access to state-of-the-art materials and device-level theory and simulation

CISM is not just a building, it is a multi-sectoral, multi-disciplinary cooperative concept characterised by a network of partnerships and growing out of the TRL spanning ecosystem already developing in South Wales. The main CISM partners are SU, IQE, SPTS and NWF. A further nine partners have recently joined. We are continuing to gather more support and if you are interested please get in touch.
This concept has been developed in partnership with our main partners over the last 12 months via our CISM Programme Board, who meet on a monthly basis to progress concepts and the overall programme.

The proposed Centre for Integrative Semiconductor Materials (CISM) building will be located at the heart of Swansea University Bay Campus within the existing engineering quarter. This location will allow for collaboration and shared facilities with the existing surrounding engineering buildings.
The proposed building will be three stories covering 4320sqm of clean room, research and office facilities. The mass has been developed to be appropriately scaled to the surrounding buildings and aligned to the existing campus development master plan within an existing development site. The building will use sustainable, energy efficient building techniques and renewable energy technology including solar PV and heat recovery. We aim to achieve a minimum assessment of BREEAM ‘Excellent’. Concept designs of the facility, along with building massing can be found below.
The CISM Design Sub-committee is made up of representatives from our main industry partners, Swansea University including our Estates team and architects and technical advisors. The Design Sub-committee meet on a regular basis to drive forward progress. The project is currently at RIBA stage 1.

We are looking for partners. Do you want to get involved? Please click here to contact us.
Dr Matt Elwin
Professor Paul Meredith
Professor Owen J Guy
Associate Professor Mike Jennings
Public Consultation prior to Planning Application
Planning Notices
Hysbysiadau cyn-ymgeisio ATODLEN 1B
Pre-application noticies Schedule 1B
Presentation Boards
CISM Supporting Information
CISM - Draft Application Forms
CISM - Drainage and Flood Statement
CISM - EIA Health Check Report
CISM - Low and Zero Carbon Technologies
CISM - Prelimiary Ecolgical Appraisal
CISM - Swansea University CISM Design and Access Statement
CISM - Swansea University Travel Plan 2015
CISM - Transport Statement 2019
Planning Drawings
CISM Planning Drawings - Building Relocations
CISM Planning Drawings - Drainage General Arrangement
CISM Planning Drawings - Existing Site Plan and Demolition Plan
CISM Planning Drawings - First Floor Lab Floor
CISM Planning Drawings - Ground Floor Plan
CISM Planning Drawings - Location Plan
CISM Planning Drawings - Proposed Elevations North and East
CISM Planning Drawings - Proposed Elevations South and West
CISM Planning Drawings - Proposed Gas Store
CISM Planning Drawings - Proposed Site Plan
CISM Planning Drawings - Proposed Site Plan (2)
CISM Planning Drawings - Second Floor Office Level
CISM Planning Drawings - Site Plan. Delivery and Maintenance Access
CISM Planning Drawings - Site Plan. Pedestrian Cycle Access
CISM Planning Drawings - SITE PLANNING
CISM Planning Drawings - Site Sections
CISM Planning Drawings - Site Security Plan
Comments
If you have any comments regarding the CISM project please complete the CISM comments form and return it via campusdevelopment@swansea.ac.uk